The lack of protection of the multimillion dollar
fibre optic cables in the sea by maritime authorities have led to frequent
breaches by ships and fishermen, resulting in disruption of services. But there
is a strong caution as reported by Charles
Benoni Okine.
The
Deputy Minister of Communications, Ms Victoria Hammer, has called on maritime
authorities to help protect the submarine cables from occasional breaches to
avoid the disruption of supply of service to the ICT industry in the country.
She also
stressed the need for the fishing communities to be involved in educational
programmes to enable them to appreciate the importance of the fibre optic
infrastructure in the nation’s development.
Ms Hammer
made the call at the weekend during the inauguration of the fifth submarine
fibre optic cable meant to increase the country bandwidth capacity from 7.2
terabytes held by Glo One; Main One, Vodafone SAT 3 and West Africa Cables
(WACS) held by MTN, to 12.3 terabytes with the addition of 5.1 terabytes from
ACE.
The $700
million cable which was landed by Africa Coast To Europe (ACE), a consortium of
16 operators in the telecoms industry including Expresso in Ghana, is 17,000
kilometres long.
ACE submarine
communications cable is a cable
system along the west coast of Africa between France and South Africa managed by a
consortium of 16 operators and administrations headed by France Telecom and Orange.
The
cable was manufactured by Alcatel Submarine Networks (ASN) and was laid by
ships from ASN and France Telecom Marine.
The
first phase of the fiber optic cable was put in service on December 15, 2012, with
an official inauguration ceremony held on December 19, 2012 in Banjul, The
Gambia.
The ACE Cable will eventually connect 23 countries, either
directly for coastal countries or through land links for landlocked countries, like Mali and Niger and it
will be the first international submarine cable to land in Equatorial Guinea, The Gambia, Guinea, Liberia, Mauritania, Sao Tome and
Principe and Sierra Leone.
“We are seeking to build a telecommunications industry that
is robust, vibrant and efficient and which will be the impetus for economic
development of the country”, the Deputy Communications Minister said adding
that, when breaches of the submarine
fibre-optic cables occur, they effectively cut the nation out of the global
communications.
Deregulating submarine
cable sector
In 2007, it was observed in the national Telecom Policy that
the arrangement where the then Ghana telecom owned and operated accesses to the
SAT-3 international cable represented an important bottleneck resource over
which Ghana Telecom held significant market power.
Accordingly, the National Communications Authority (NCA) the
industry regulator was called upon to exercise its regulatory authority over
access to and the pricing of the SAT_3 transmission links to other operators in
the interest of promoting fair competition and cost effective development of
the telecom sector.
According to the NCA, in its bid to exercise its regulatory
authority, it observed that deregulation of the sub-marine cable sector was the
most effective means of regulating prices and enhancing access.
That led to the granting of landing rights licenses firs to
Main One and subsequently Glo-1, WACS and now ACE.
The landing of the first two had an impact on prices and
access and it is therefore expected that the landing of the latest one would
further correct the pricing imbalances in the market.
The Deputy Director-General of the NCA, Mr Albert Enninful
who was the function also hinted that the NCA had observed another bottleneck
in the data sub-sector which had to do with limited deployment of data networks
in what he termed as the “golden triangle of Accra, Kumasi and Takoradi”.
According to him there was also a focus on corporate
clientele by Internet Service Providers (ISPs) who tended to neglect homes and
small businesses.
To address this, he said “the Authority decided to issue
broadband wireless access licenses in January 2009 and Broadband Wireless
Access (BWA) licenses to potential 4G networks in 2013” adding that “These
licenses have rollout targets that include the coverage of all district
capitals midway through the license duration”.
No comments:
Post a Comment